Resurfacing


A580 Tunnel Relief Flyover

Location: Liverpool
Client: City of Liverpool
Consultant:
City of Liverpool
Main contractor: Kennedy Asphalt
Contract value: £200,000
Contract duration: 6 weeks

Project details:

Replacing the waterproof layer and resurfacing one of the major roads exiting Liverpool city centre requires excellent traffic management and programming, especially over a rigid schedule.

Green ArrowIncorporating many aspects of the Bardon Contracting business
Green ArrowProject completed to time
Green ArrowProject completed to budget
Green ArrowResurfacing completed within restricted area
Green ArrowNo disruption or damage to surrounding infrastructure or structural integrity of the flyover

  A580 Tunnel Relief Flyover  

Principal activities:

Green ArrowPlaning
Green ArrowWaterproof layer replacement
Green ArrowResurfacing with hot rolled asphalt (2,000m²)
Green ArrowRenewal of the drainage system
Green ArrowStructural integrity assessment of the bridge deck
Green ArrowReplacement of the expansion joints